A design office behind "Seikō-an," a two-mat modern assembly-kit tea room.
Tap 'Visit official site' to go to this company's own website. Please send inquiries and quote requests directly through their channels.
Source: d-architects.jp
A first-class architect office in Kyoto led by architect Hideo Doi. Its four concepts are creating new Japanese spaces that fuse traditional Japanese space with modernism, architecture that coexists with nature, sustainable architecture, and preserving and regenerating existing buildings.
Its key tea-room work is "Seiko-an," a two-mat modern assembly tea room (W2090 × D2090 × H2310 mm when assembled). A frame of laminated hinoki carries inner walls of Kyoto karakami paper, outer walls of modern Japanese murals on washi and a hinoki kumiko transom; it can serve for incense and ikebana as well as tea, and can be set up in event spaces, hotels, homes and apartments. It is produced by Shisojuken Co., Ltd. in Himeji, which also handles enquiries on production and price.
The portfolio also includes "Kohkoh-an," a one-mat assembly incense room (W2490 × D980 × H1800 mm, reinforced cardboard and tatami) based on the thesis "Incense and Space" at the Kyoto City University of Arts graduate school. In December 2015 Doi gave a talk at the Japan Seminar of Inno Design Tech Expo 2015 at the Hong Kong Convention & Exhibition Centre. Suited to those who want a design-minded space for tea in a home or facility with little construction.
From first meeting to completion, and feesFrom first meeting to completion, and fees
It begins with a free consultation at the office (bring a site survey if you have one). Next comes a paid basic plan—site and legal surveys and a proposal in drawings and sketches, about 2–3 weeks. If you proceed, you sign a design-and-supervision contract, and the basic-plan fee counts toward 30% of the design fee.
Schematic design meetings are every 1–2 weeks and detailed design about every 2 weeks; 40% of the fee is due at detailed design (permit fees extra) and the final 30% at completion (inspection fees extra). The site is checked once or twice a week during construction, with an inspection one year after completion.
Range of workRange of work
The record spans houses (Sasayama, Shimogamo, Mizuho and more), ryokan (phases 1–7 of Yuraku in Kinosaki, Kajika-sō in Kimino), restaurants, clinics, shop interiors and exhibition design; in 2026 the renovation of Building 5 at Konan Women's University, designed by Tōgo Murano, was added to the portfolio.